Latest News

Summer developments and future plans for the College

03 Jun 2016

We are delighted to announce that over the summer improvements of our current facilities are in the pipeline, and more long term building extensions are also due to be completed at a later stage. The bulk of the work will be upgrading toilets and washrooms, building a new medical room, redecorating throughout and replacing carpets in the hallways to improve the ambiance for students and staff.  To maintain the creative and inspiring look and feel of the College, the Principal will be purchasing further art work to adorn the walls.

Long term, the plan is also to increase the teaching space by adding three new classrooms on the ground floor. The car park will also be upgraded to provide a nice outdoor area where students can relax between lessons and study periods.The below is an initial artist's impression of the new look of the exteriors. We look forward to be sharing more information very shortly. 

Introducing our new Head of English: Philip Carr

Posted on 19 Jul 2017 | Academic

We are delighted to introduce our new Head of English; Philip Carr. Philip has a literature degree from Cambridge University, [...]

Read more

End of Year Assembly and Prize Giving

Posted on 30 Jun 2017 | Academic

Friday 30 June marked the end of the academic year, and was celebrated through an end of year assembly for our [...]

Read more

UCAS Preparation Days

Posted on 28 Jun 2017 |

On Monday 26 and Tuesday 27 June, Ealing Independent College hosted our annual UCAS Preparation Days for Year 12 students. The two days [...]

Read more
Top

Accreditations:

Independent School Association UK | ISA

© 2017 Ealing Independent College London, 83 New Broadway, London W5 5AL

Tel: +44 (0)20 8579 6668 | Email: info@ealingindependentcollege.com

Terms & Conditions | Privacy Policy | Site Map

Part of:
Bellevue Education